28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 3.16 X-Axis Solenoid to Rack Guide Check
3 - 55
3
Search
Book TOC
Go Back
VP - 3.16 X-Axis Solenoid to Rack Guide Check
Purpose:
Perform this procedure to verify ali
g
nment of X-Axis Solenoids with Rack Guides, Fi
g
ure
3-25.
1. Remove Racks and any loose items from Platen.
2. Cycle Power Off/On.
NOTE:Do not put Loader in Manual Mode.
NOTE:Analyzer must be Initialized or Ready.
3. Wait for Sample Loader to complete initialization.
4. Verify ali
g
nment of X-Axis Solenoids at Ri
g
ht Rack Guide (Fi
g
ure 3-25).
5. Verify ali
g
nment of X-Axis Solenoids at the Left Rack Guide
a. Cycle Power Off/On.
b. Observe X-Axis Solenoids. When Solenoids stop for the second time at the Left Rack Guide
turn Sample Loader Power off.
c. Use strai
g
ht ed
g
e on both sides of Rack Guide (Fi
g
ure 3-25).
Special Tools
DESCRIPTION QTY PN
None