28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
3.3 VERIFICATION PROCEDURES
3 - 9
3
Search
Book TOC
Go Back
3.3 VERIFICATION PROCEDURES
VP - 1 Power Supply Check [NON-CE MARK]
Purpose:
Perform this procedure to verify operation of Non-CE Mark Loader Power Supplies.
1. Verify Volta
e Select Switch is set for line volta
e.
2. Ensure Line Fuse is correct, see Table 3 - 2.
3. Turn Power
ON
.
All Keyboard LEDs should flash and Beeper sounds.
Special Tools
DESCRIPTION QTY PN
None
Table 3 - 2
Voltage Fuse Type
120VAC 1.6A FB 250V (5x20mm)
220/240 VAC 2.0A SB 250V (5x20mm)