28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 3.12 Platen to Laser Shield Check
3 - 47
3
Search
Book TOC
Go Back
VP - 3.12 Platen to Laser Shield Check
Purpose:
Perform this procedure to verify Platen is ali
ned (front to back) with the Tower.
1. Ensure Laser Shield hardware is ti
ht.
2. Verify Laser Shield is sli
htly recessed from Platen Wall. Check Left and Ri
ht end of Laser
Shield (Fi
ure 3-21).
• IF Check is OK,
o to “VP - 3.14 Pusher Arm to Platen Check” (Pa
e 3-51).
• IF Check Fails,
o to “VP - 3.13 Platen to Laser Shield Adjustment” (Pa
e 3-49).
Special Tools
DESCRIPTION QTY PN
None