28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 13.1 Lead Bubble Check/Adjustment
3 - 154
3
Search
Book TOC
Go Back
VP - 13.1 Lead Bubble Check/Adjustment
Purpose:
Perform this procedure to verify and adjust Lead Bubble on E Loaders with old style (clear
plastic) Wash Blocks.
1. Verify proper connection of sample line to Sample Needle.
a. Slide the sleeve off of the sample line/Sample Needle connection.
b. Verify the sample line is properly connected to the Sample Needle.
c. Reseat the sleeve.
2. Verify sample tubin
from Blood In-line Sensor to Solenoid 96 is not crimped.
3. Put Sample Loader in Manual Mode.
a. Press and Hold
MAN
and
START
.
b. Turn Power
ON
, hold keys down until BEEPING stops.
4. Clean the sample path:
a. Place tube with enzymatic cleaner under Sample Needle.
b. Lower Sample Needle into tube of cleaner.
c. Aspirate 1/2 tube cleaner by manually openin
Solenoid 96 and 92.
Cleaner drawn throu
h Sample Needle, Shear Valve and deposited in Waste Chamber 2.
Special Tools
DESCRIPTION QTY PN
None