28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
3.1 OVERVIEW
3 - 3
3
Search
Book TOC
Go Back
3.1 OVERVIEW
This chapter contains:
• Interrelationship Matrix
• Adjustment and Ali
nment Procedures (called Verification Procedures) for the Sample Loader
(Type E, F and G)
The Interrelationship Matrix identifies the Ali
nments and Adjustments (VPs) required when various
parts are replaced. For example, if the Laser Shield is replaced, VP - 3.8, VP - 3.12, and VP - 11.1,
should be performed in the order indicated by the number in the VP column.
Verification Procedures ensure somethin
is ali
ned, adjusted, and workin
the way it should.
Usually it is checked first, then adjusted or ali
ned if the check is incorrect or questionable.
--- END ---