28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 10.1 Tube Positioning Arm Check
3 - 133
3
Search
Book TOC
Go Back
VP - 10.1 Tube Positioning Arm Check
Purpose:
Perform this procedure to verify Tube Positionin
Arm Operation and Ali
nment, Fi
ure
3-72.
NOTE:E and F Loaders Only - G Loader does not have a Tube Positioning Arm.
1. Before performin
this procedure, perform “VP - 3.8 Rack to Laser Shield Check” (Pa
e 3-39).
2. Remove racks from under mixin
assembly.
3. Put Sample Loader in Manual Mode.
a. Press and Hold
MAN
and
START
.
b. Turn Power
ON
, hold keys down until BEEPING stops.
4. Set
BAR (1/0) Switch
to
1
.
5. Press
MAN
to actuate arm.
6. Measure ener
ized and non-ener
ized tube position arm distances from Platen Wall, not Laser
Shield (Fi
ure 3-72).
F Loader Only
a. Measure both arms. Each arm should extend 0.32 - 0.4” (8 - 12mm) from Platten Wall.
7. Actuate and measure arm several times to ensure arm does not dra
on shield or platen.
Special Tools
DESCRIPTION QTY PN
None