28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 3.9 Rack to Laser Shield Adjustment
3 - 41
3
Search
Book TOC
Go Back
VP - 3.9 Rack to Laser Shield Adjustment
Purpose:
Perform this procedure to ali
n the Platen (side to side) with the Tower.
1. Perform Check procedure “VP - 3.8 Rack to Laser Shield Check” (Pa
e 3-39).
2. Loosen (4) Platen Mountin
screws 1/2 Turn (Fi
ure 3-18).
NOTE:Mounting screws are located below Platen wall cutouts.
3. Ali
n Tube Positions # 3 and #5 on Laser Shield cutouts (Fi
ure 3-17) by movin
Platen left or
ri
ht. Ti
hten screws.
4. Go to “VP - 3.10 X-Axis Solenoids to Platen Channel Check” (Pa
e 3-43).
Special Tools
DESCRIPTION QTY PN
Rack Guide
Ali
nment Tool
1 9420084