INSTALLATION AND STARTUP
14-2 Belanger, Inc. ®* PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL220
Chapter 14 HydroBlade® Assembly Option
HydroBlade® Specifications
Utilities
10HP Medium Pressure Pumping Station
Electrical Requirements
10HP, 3-phase
208 @ 32 Amps
230 @ 31.5 Amps
VAC 120 @ 2 Amps constant from GFCI protected circuit side
Specified output 120V signaled
Water Requirements
1’’ @ 30 GPM @ 40 PSI
25HP Pumping Station
Electrical Requirements
25HP, 3-phase
208 @ 78 Amps
230 @ 68 Amps
460 @ 34 Amps
VAC 120 @ 2 Amps constant from GFCI protected circuit side
Specified output 120V signaled
Water Requirements
1’’ @ 30 GPM @ 40 PSI
Tools Required
3/4” wrench
Two adjustable wrenches
1/16’’ Allen wrench
Safety glasses
See Nozzle Chart later in this chapter for more details.