EasyManua.ls Logo

Belanger FreeStyler - General Requirements; Utility Requirements

Belanger FreeStyler
321 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION AND STARTUP
1MANUL220 Belanger, Inc.® * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 18-1
Chapter 18 Spot Free Rinse (RO) Option
Note: The information in this portion of the document was supplied by Pur-Clean™, A division of New
Wave Industries LTD. Pur-Clean™ equipment is designed for easy installation. However, should
you have any questions, please call New Wave Industries LTD. at (916) 978-9990 or (800) 882-
8854.
General Requirements
1) Provide a covered and/or heated enclosed area with at least 30” x 72” of floor space
2) Electrical, see site specific drawings
3) Plumbing, see site specific drawings
4) 2” drain
Utility Requirements
Note: See the site-specific plumbing layout for more details.
Requirements
Water
3/4” water line with Ball
Valve, 20 GPM @ 30 PSI
for RO System
Drain
Electrical
Two, 208/220V, 20 Amp,
single-phase circuits, each
with its own L6-20 locking
receptacle. Place this plug
60” up from the floor on the
right side of the RO unit.
64”
72”
23”
24”
36”
100-Gallon
Tank
Front View
Top View

Table of Contents

Related product manuals