INSTALLATION AND STARTUP
1MANUL220 Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 14-13
Chapter 14 HydroBlade® Assembly Option
HydroBlade® Purge Air Assembly – Installation
5) Install a section of 1/2” airline between the HydroBlade® Low Pressure Feed Kit and the MAC valve. See the
images below.
6) Run the electrical lead from the MAC valve to port #5 on the Electrical Junction Block/Euroblock located in the C-
Channel in the Carriage as shown below.