EasyManua.ls Logo

Dionex As - Replacing a Sample or Prep Syringe Pump Assembly

Dionex As
356 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5•Service
Doc. 065051-03 1/08 169
5.15 Replacing a Sample or Prep Syringe Pump Assembly
The following syringe pump assemblies are available: Sample syringe
(P/N 062382), dual sample syringe (P/N 062379), and sample prep syringe
(P/N 062365)
1. Turn off the AS power.
2. Disconnect the liquid lines from the existing syringe valve.
3. Unplug the syringe cable from the rear panel connector.
4. Lift up the syringe pump assembly and remove it from the organizer.
5. Set the new syringe pump assembly into the organizer.
6. Connect the liquid lines.
7. Plug in the cable.
8. Turn on the AS power.

Table of Contents

Related product manuals