GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-48 Section 8-3 - Control Console Components Replacement Procedures
PRELIMINARY
2.) Position the Keyboard Interface Assembly on the Joint Assembly and thread the gas spring cable
through the black Keyboard Interface Assembly cone and lower the assembly onto the joint.
3.) From above the Keyboard Interface Assembly, push the swivel lever outwards as shown on the left
in Figure 8-61, then push the Keyboard Interface Assembly firmly downwards onto the Joint
Assembly as seen on the right in Figure 8-61.
4.) From below the Keyboard Interface Assembly base, return the securing bolt (see Figure 8-58) and
tighten the bolt using a torque wrench to a pressure of 10 Nm.
5.) After tightening to 10 Nm, loosen the bolt by turning the torque wrench 1/4 of a turn.
Figure 8-60 Keyboard Interface Assembly on the Joint Assembly
Figure 8-61 Keyboard Interface Assembly Positioned on Joint
Gas Spring Cable
Interface Assembly Cone