EasyManua.ls Logo

ICON A5 - Page 125

ICON A5
836 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STRUCTURES / USE OF VHB TAPE FOR INSTALLATIONS AND REPAIRS 4-13
CHANGE C2 ICON A5 / MAINTENANCE MANUAL
CHAPTER 4
6. Join parts using approximately 15 psi of pressure. Temperature to be between 70° F (21° C) and
100° F (38° C).
7. Allow 72 hours for 100% bond strength cure (20 minutes=50%, 60 minutes=75%, 24
hours=90%).
Installation Drawing References
ICA000500 VORTEX GENERATOR AND FENCE INSTL, FUSELAGE
ICA009726 VORTEX GENERATOR, 2.3, INJ MLD, WHITE
ICA009210 FENCE, FLAP ROOT, RH
ICA009211 FENCE, FLAP ROOT, LH
ICA000501 STALL STRIP, INSTL
ICA009265 STALL STRIP, TRIANGULAR XSECT, 18X.75
ICA000502 VORTEX GENERATOR INSTL, WING
05-04662 VORTEX GENERATOR, AIR WAVE
VERIFICATION METHOD:
After the tape is fully cured, pull firmly on the component to ensure that it is bonded properly to the
attaching surface.
RELATED INFORMATION:
"Wing Trailing Edge Light Fence Replacement" on page 17-16

Table of Contents

Other manuals for ICON A5