EasyManua.ls Logo

ICON A5 - Page 799

ICON A5
836 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ICON PARACHUTE SYSTEM (IPS) / HARNESS 19-15
CHANGE C1 ICON A5 / MAINTENANCE MANUAL
CHAPTER 19
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
16—ICON Parachute System (IPS)
Consumables
None
TASK INSTRUCTIONS:
1. Check for harness and riser entanglement and obstruction at all locations.
2. Ensure the full length of the harness is free of damage and fraying.
3. Check the three attachment points for security, damage, and abnormalities.
VERIFICATION METHOD:
Harness is secure at all locations and free of damage and other abnormalities.
RELATED INFORMATION:
"Removal and Installation of Inspection Panels and Fairings" on page 3-34
"Cockpit Panels Removal and Installation" on page 3-36
19.5.4 Maintenance Instructions
19.5.4.1 Harness Installation
Use the following tasks to place and route the harness system.
TASK INFORMATION:
Type of Maintenance
Line
Level of Certification
LSA-RM

Table of Contents

Other manuals for ICON A5