EasyManua.ls Logo

Kentrox RMX-3200 - Configuring Job Start Times

Kentrox RMX-3200
388 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Remote RMX-3200 Version 5.2x Configuration Guide
Configuring Jobs: Configuring Job Start Times
23-12
Configuring Job Start Times
To configure start times for a job:
1. At the main prompt, configure job
printlog to start on August 7 and to run
through September 30 every Monday, Wednesday and Friday at 12:30 p.m., 5:30
p.m. and 7:30 p.m.:
config jobs name printlog start-at 8-9 7-30 12,17,19 30 1,3,5
A start-at index number of 1 is assigned.
2. (optional) Verify that job
printlog has been configured with the proper starting
times:
show jobs name printlog starts *
The command response similar to the following displays:
3. Save the configuration.
In this scenario, you will configure a
job to start on August 7 and to run through
September 30 at 12:30 p.m., 5:30 p.m. and 7:30 p.m. every Monday, Wednesday
and Friday.
(Dub)>show jobs name printlog starts *
Cron start: disabled
Start at bootup: disabled
Start-at index: 1
Month: 8-9
Day: 7-30
Hour: 12,17,19
Minute: 30
Weekday: 1,3,5
No scheduled start time
(Dub)>

Table of Contents

Related product manuals