28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 5.1 Tube Detect Sensor (Beam Block) Check
3 - 68
3
Search
Book TOC
Go Back
5. Put tube in position #1 of Rack #1 (closest to tower), Fi
ure 3-32.
6. Push (
Y
) to move racks toward tower.
7.
MAN
LED should flash with tube in #1 position and Rack #1 under tower (Fi
ure 3-32).
8. Slowly lean tube side to side, front to back, and rotate tube.
MAN
LED should continue to flash.
Ensure LED flashes when tube leans to the ri
ht.
9. Move tube to position #1 of Rack #2.
MAN
LED should be
OFF (
Fi
ure 3-32).
10.Lean tube toward Beam Block, "
MAN
" LED should be
OFF
. If either check fails,
o to “VP - 5.2
Tube Detect Sensor (Beam Block) Adjustment” (Pa
e 3-70).