EasyManua.ls Logo

Abbott CELL-DYN 3000 - Page 240

Abbott CELL-DYN 3000
296 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 7.1 Mixing Paddle Overcurrent Alarm Check
3 - 115
3
Search
Book TOC
Go Back
6. Press R on keyboard to turn on mixin
g
assembly.
7. Verify Loader beeps.
For F or G Loader
g
o to
Step 11
.
• For E Loader
g
o to
Step 9
.
8. If check fails,
g
o to
Step 10
.
9. Perform the followin
g
procedure (E Loader only):
a. Reconnect Motor # 1 and connect Mixin
g
Motor Current Tool to Mixin
g
Motor #2.
b. Press
(R)
key.
- If Loader beeps,
g
o to
Step 11.
- If check fails,
g
o to
Step 10
.
10.Perform “VP - 7.2 Mixin
g
Paddle Overcurrent Alarm Adjustment” (Pa
g
e 3-116).
11.Connect motor.
E Loader Only
- Check Connection Match up.
a. Mixin
g
Motor # 1 should be connected to Blue and Purple wires.
b. Mixin
g
Motor # 2 should be connected to Yellow and Oran
g
e wires.
c. Set
BAR Switch
to
0
.
d. Press and hold (
R)
key. Only Mixin
g
Motor #1 (left) rotates.
--- END ---

Table of Contents

Other manuals for Abbott CELL-DYN 3000

Related product manuals