Maintenance-Object Repair Procedures
555-233-143
8-368 Issue 1 May 2002
For endpoints of this type, the signaling link is “bound” when the link is
connected at Layer 2 and the link has been associated with an endpoint,
[that is, the endpoint has completed SPID initialization (L3 established)].
■ ASAI adjuncts and BRI endpoints not administered for MIM
initialization (point-to-point):
For endpoints of this type, the signaling link is “bound” when the link is
connected at Layer 2 (L2 established).
For every endpoint type, a signaling link becomes “unbound” when it is
disconnected at Layer 2. For BRI endpoints supporting MIM initialization, a
signaling link may also become “unbound” if a subsequent attempt to perform
SPID initialization on a “bound” link fails (that is, wrong SPID is entered into the
endpoint by the user).
Table 8-155. Test #626 Signaling Link Status Test
Error
Code
Tes t
Result Description / Recommendation
1139 ABORT The EPN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute the test port long PCSSpp command,
and review the results of the BRI Port Local LAN Loop Around test (#618)
to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
2. If step 1 does not resolve the problem, escalate to the next tier.
Continued on next page