Maintenance-Object Repair Procedures
555-233-143
8-376 Issue 1 May 2002
BRI Layer 3 Query Test (#629)
This test is used to check the application layer communications between the
switch and the endpoint or adjunct.
For BRI endpoints, an application message containing the appropriate endpoint
service state is sent by the switch to the endpoint. The endpoint responds with an
acknowledgment to the application message.
For ASAI and Avaya adjuncts, this test is not executed from the administration
terminal. Rather, a query message is automatically sent by the switch every two
minutes. Failure of the switch to receive a response to a query from the adjunct is
logged in the Hardware Error Log.
Table 8-158. Test #629 BRI Layer 3 Query
Error
Code
Tes t
Result Description / Recommendation
1005 ABORT The endpoint’s MIMs Supported? field is administered to “no.”
1. Use the change station extension command to change the parameter
only if the endpoint documentation reflects support for ISDN-BRI
Management and Maintenance Procedures.
1113 ABORT The signaling link between the switch and the endpoint or adjunct is down.
1. Use the test port PCSSpp long command to clear any errors that prevent
establishment of the signaling link.
2. Examine the results of Test #626 that are executed with the command. If
this test aborts or fails, follow the repair procedure for the Signaling Link
Status test.
3. Escalate problem if BRI Layer 3 Query test continues to abort.
1139 ABORT The EPN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute the test port long PCSSpp command,
and review the results of the BRI Port Local LAN Loop Around test (#618)
to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Consult the repair procedure for PKT-CTRL (Packet Control Circuit Pack)
Maintenance documentation.
2. If step 1 does not resolve the problem, escalate to the next tier.
Continued on next page