CLAN-BD (Control LAN Circuit Pack)
Issue 1 May 2002
8-427555-233-143
Link Status Test (#601)
This nondestructive test determines the state of the call-control signaling link for
Control LANs. If the signaling link is physically connected, the test sends a test
frame over the link and checks for a response. The test passes only if both the
signaling link is connected and the test frame is successfully transmitted.
A failure may indicate a problem with:
■ this circuit pack
■ the packet bus
■ the Packet Interface circuit pack
Table 8-174. Test #601 Link Status Test
Error
Code
Tes t
Result Description / Recommendation
1125 ABORT RSCL link or C-LAN board not in service.
1. Release the board.
2. Repeat the test.
3. Escalate if the problem persists.
2012 ABORT Could not allocate the necessary system resources to run this test.
2100 ABORT Internal system error.
1. Retry command at 1-minute intervals up to 5 times.
2. If the problem persists, escalate the problem.
2 FAIL The RSCL control link disconnected.
1. Retry command at 1-minute intervals up to 5 times.
2. If the test continues to fail, execute Packet Interface test (#598) (test
board UUCSS) to determine whether the problem is due to the circuit
pack.
3. If Packet Interface test (#598) fails, see ‘‘PKT-INT (Packet Interface)’’ on
page 8-1238 for repair procedures.
4. If Packet Interface test (#598) passes, refer to Packet Control circuit pack
and packet-bus repair procedures.
3 FAIL Received no response to RSCL control link test frame.
1. Retry command at 1-minute intervals up to 5 times.
2. If the problem persists, reset the circuit pack (reset board UUCSS).
3. If test continues to fail, replace the circuit pack.
PASS RSCL control link connected.