EasyManua.ls Logo

Avaya S8700 - Page 1417

Avaya S8700
2618 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DS1 CONV-BD
Issue 1 May 2002
8-695555-233-143
Converting DS1-CONV Complex to Direct-
Connect Fiber (duplicated PNC)
NOTE:
The procedure below is generic in its scope. Check the customers switch
configuration for EI/SNI structures.
!
WARNING:
Do not power down a Switch Node carrier to replace a circuit pack.
!
WARNING:
In duplicated PNC configurations, one DS1-CONV complex in the fiber-link
serves as the active and the second DS1-CONV complex serves as the
standby. Each DS1 Converter complex consists of two TN574 or TN1654
circuit packs.
Table 8-269. Convert from DS1-CONV to direct-connect fiber in a
duplicated PNC
÷ # Command/Step Description
1. status pnc Verify that the A-side is active.
1. If the B-PNC is active, enter reset
pnc-interchange and press
Enter.
2. Then verify that the A-side is active (status
pnc).
2. busyout pnc-standby Busyout the duplicated switch side.
3. change
system-parameters
duplication
Disable PNC duplication by changing the
Enable
Operation of PNC Duplication?
field to
n.
4. list fiber-link Lists administered fiber connections by number.
Select the link number associated with the
appropriate DS1-CONV complex that you are
removing.
5. busyout fiber link n Busyout the fiber link of interest. The fiber link
number (step 6) is n for this command.
6. remove fiber link n Remove the link administration for this link.
7. change circuit-pack
cabinet
Remove the DS1-CONV administration for the four
designated circuit packs (cabinet is the cabinet
number where these DS1-CONV complexes reside).
Press
Enter.
Continued on next page

Table of Contents

Other manuals for Avaya S8700

Related product manuals