EasyManua.ls Logo

Avaya S8700 - Page 2468

Avaya S8700
2618 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance-Object Repair Procedures
555-233-143
8-1746 Issue 1 May 2002
1311 FAIL The Integrated CSU (I-CSU) Module Equipment Loopback (ELB) test (#1210)
failed. This test is executed by the I-CSU during I-CSU power-up/reset (i.e., the
UDS1 board is physically inserted and a CSU module or a Sync Splitter is
already installed) or when the CSU module/
Sync Splitter is plugged on to an
already initialized DS1 board. The ELB test is also executed as part of the
command test ds1-loop UUCSS ds1/csu-loopback-tests for the CSU module
and T1 sync splitter.
1. Execute the test ds1-loop UUCSS ds1/csu-loopback-tests command.
2. If the ELB test continues to fail, then either the UDS1 board, the CSU
module/T1 sync splitter, or the I/O cable between the backplane and the
CSU module/T1 sync splitter (or any combination thereof) has failed.
Attempt to isolate the problem to one of these areas. Begin by replacing
the CSU module/T1 sync splitter and running the test ds1-loop UUCSS
ds1/csu-loopback-tests command again.
3. If the ELB test continues to fail, then replace the UDS1 board, and run the
test ds1-loop UUCSS ds1/csu-loopback-tests command again.
4. If the ELB test continues to fail, the problem could be in the I/O cable
between the backplane and the CSU module/T1 sync splitter.
1312 FAIL The Integrated CSU (I-CSU) Module Repeater Loopback (RLB) test (#1211)
failed. This test is executed during I-CSU/Sync Splitter power-up/reset (i.e., the
UDS1 board is physically inserted and the CSU module or the Sync Splitter is
already installed) or when the CSU module/Sync Splitter is plugged on to an
already initialized DS1 board. The RLB test is also executed as part of the
command test ds1-loop UUCSS ds1/csu-loopback-tests for the CSU
module/T1 sync splitter.
1. Execute the test ds1-loop UUCSS ds1/csu-loopback-tests command.
2. If the RLB test continues to fail, then replace the CSU module/T1 sync
splitter.
3. Run this test again.
1313 FAIL The UDS1 circuit pack could not deactivate a CPE Loop-Back Jack loopback.
1. Execute the test ds1-loop UUCSS end-loopback/span-test command.
2. If the attempt to deactivate the CPE Loop-Back Jack is not successful,
check the cabling and investigate the problem at the CPE Loop-Back Jack.
3. Run the test again.
1314 FAIL The UDS1 circuit pack could not deactivate a far-end CSU loopback.
1. Execute the test ds1-loop UUCSS end-loopback/span-test command.
Table 8-673. Test #138 Loss of Signal Alarm Inquiry Test Continued
Error
Code
Tes t
Result Description / Recommendation
Continued on next page

Table of Contents

Other manuals for Avaya S8700

Related product manuals