Maintenance-Object Repair Procedures
555-233-143
8-1778 Issue 1 May 2002
2100 ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL UDS1 Interface circuit pack failed the DS1 Board Loopback test.
1. Retry the test ds1-loop UUCSS ds1/csu-loopback-tests command.
2. If the BLB test continues to fail, then replace the UDS1 circuit pack.
PASS The BLB test executed successfully. The test pattern was transmitted and
received successfully up to the DS1 board edge.
0NO
BOARD
The test could not relate the internal ID to the port (no board). This could be
due to incorrect translations, no board is inserted, an incorrect board is
inserted, or an insane board is inserted.
1. Verify that the board’s translations are correct. Execute the add ds1
UUCSS command to administer the UDS1 interface if it is not already
administered.
2. If the board was already administered correctly, check the error log to
determine whether the board is hyperactive. If so, the board was shut
down. Reseating the board will re-initialize it.
3. If the board was found to be correctly inserted in step 1, then issue the
busyout board command.
4. Issue the reset board command.
5. Issue the release busy board command.
6. Issue the test board long command.
This should re-establish the linkage between the internal ID and the port.
Table 8-682. Test #1209 DS1 Board Loop-Back Test — Continued
Error
Code
Tes t
Result Description / Recommendation
Continued on next page