EasyManua.ls Logo

Dionex As - Page 93

Dionex As
356 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Operation and Maintenance
Doc. 065051-03 1/08 81
Example Simultaneous Injection Program: Two Valves Installed in
an ICS-1000/1500/2000
InjectValve_1.InjectPosition ;Switch the first inject
valve to Inject
InjectValve_2.InjectPosition ;Switch the second
inject valve to Inject
Inject ;Sweep the sample onto
the column
Wait InjectState ;Wait for the injection to
finish
0.000 Pump_InjectValve.LoadPosition ;Switch the first inject
valve to Load
Pump_InjectValve_2.LoadPosition ;Switch the second
inject valve to Load
Load ;Load sample onto the
loop
Wait CycleTimeState ;Wait for the end of the
specified Cycle Time
Pump_InjectValve.InjectPosition ;Switch the first inject
valve to Inject
Pump_InjectValve_2.InjectPosition ;Switch the second
inject valve to Inject
Inject ;Sweep the sample onto
the column
Wait InjectState ;Wait for the injection to
finish

Table of Contents

Related product manuals