9.8.2.8 Concluding steps
Ê "Installing memory boards" on page 223
Ê "Installing the memory rug" on page 307
Ê "Reassembling" on page 53
Ê "Connecting the server to the power source" on page 57
Ê "Switching on the server" on page 58
Ê If applicable, "Updating RAID controller firmware" on page 70.
Ê "Enabling SVOM boot watchdog functionality" on page 74
9.8.3 Removing an FBU
V CAUTION!
Do not throw backup units into the trash can. Batteries must be disposed
of in accordance with local regulations concerning special waste.
For further safety information, please refer to section "Environmental
protection" on page 41.
9.8.3.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 60
Ê "Shutting down the server" on page 46
Ê "Disconnecting power cords" on page 46
Ê "Getting access to the component" on page 48
Ê "Removing memory boards" on page 220
Ê "Removing the memory rug" on page 301
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver