6.5 Replacing the power distribution board
6.5.1 Preliminary steps
Ê "Locating the defective server" on page 43
Ê "Suspending BitLocker functionality" on page 59
Ê "Shutting down the server" on page 46
Ê "Disconnecting power cords" on page 46
Ê "Removing a hot-plug power supply unit" on page 94
Ê "Getting access to the component" on page 48
Ê "Removing memory modules" on page 225
Ê "Removing the memory rug" on page 301
Ê "Removing the system board" on page 303
Field Replaceable Unit
(FRU)
Hardware: 10 minutes
Tools: Philips PH2 / (+) No. 2 screw driver