PROPULSION / PROPELLER 16-95
CHANGE C2 ICON A5 / MAINTENANCE MANUAL
Task Specific Training Required
No
Special Tools Required
Calibrated Torque Wrench
Parts Required
None
Aircraft System and Number
13—Propulsion
Consumables
None
1. Inspect propeller per ‘ANNUAL INSPECTION’ task in the latest revision of Sensenich Propellers
document 3B0R5.
VERIFICATION METHOD:
Verify that the propeller is acceptable to each check specified and check off on the condition inspec-
tion listing.
RELATED INFORMATION:
"Condition and 100-Hour Inspection—Engine and Propeller" on page 3-21
16.2.4.2 Balance Propeller
Use the following procedure to balance the propeller.
TASK INFORMATION:
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
Propeller Balance System (such as ProBalancer Sport or DynaVibe GX3)
Parts Required
10F75MTT3-50TL (SCREW, MACH TH, 6LOBE, CRES, 10-32X.750X.500)
10F87M773/50TL (SCREW, MACH TH, 6LOBE, CRES, 10-32X.875)