2WA/2NJ/2RK
4-31
2. Pull out the conveying unit.
3. Remove two screws (a)(M4x8) and
open the front middle cover (b).
4. Lock the developer waste exit that has-
been released. (Refer P.2-14)
5. Remove the screw (c) and open the
connector cover (d).
6. Disconnect the connector (e).
7. Release the wire saddle (f).
Figure 4-36
8. Remove four fixing screws (b) of the
inner unit (a).
Figure 4-37
c
b
a
a
e
f
d