2NJ/2RK
2-7
(1-3) Take out of fixed tape and cushioning material
Remove the tape and cushioning materials for packing from the main unit.
(2) Notes on main unit transportation
*: When carrying the main unit, taking out of the machine right lower side of conveying handle(a) and with four people
as shown in the figure and hold the conveying handle and three handles(b).
Do not hold the operation unit(c) because it will cause damage.
Figure 2-7
b
b
a
b
c