EasyManua.ls Logo

NEC UNIVERGE SV8500 - Page 126

NEC UNIVERGE SV8500
975 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 79 –
CHAPTER 2 Operations of SV8500 Server
EXB - Replacement Procedure for CPU Single Configuration
[Start]
STEP 1 Turn off the SV8500 server.
<By PCPro Tools (recommended)>
On the initial screen, select “System Control” and click “Execute” button.
Select “System Shutdown” in “Select Processing” list box.
Click “Execute” button to shut down the system.
Make sure that “PWR” lamp is off on the CPU card.
Note
Turn off “Power” switch (press the right side of the switch) on the Power module.
Note: Be sure to confirm “PWR” lamp is off on the CPU card before turning off “Power” switch on the Power
module.
<By switch operation>
When PCPro Tools - System Shutdown is not available or does not work, press “PWR” switch on CPU
card for four seconds to shut down the CPU card.
Press “PWR” switch for four seconds on the CPU card.
Make sure that “PWR” lamp is off on the CPU card.
Note
Turn off “Power” switch (press the right side of the switch) on the Power module.
Note: Be sure to confirm “PWR” lamp is off on the CPU card before turning off “Power” switch on the Power
module.
STEP 2 Turn off the PIR (s) and TSWR when they are accommodated. If not skip this step.
<For 1-IMG>
Turn off the power (PWR/DPWR cards) in the following order.
•PIR0
oPIR1oPIR2oPIR3 (smaller number PIR first)
<For 4-IMG>
Turn off the power (PWR/DPWR cards) in the following order.
TSWR
•PIR0
oPIR1oPIR2o....oPIR15 (smaller number PIR first)
STEP 3 Disconnect the bus cable from the EXB card.
1-IMG: D37 SC50 CA-A (PIR connector)
4-IMG: D37 SC50 CA-B (TSWR connector)
When the system is CPU single configuration, the whole system must be shut down.
WARNING

Table of Contents

Other manuals for NEC UNIVERGE SV8500

Related product manuals