EasyManua.ls Logo

NEC UNIVERGE SV8500 - Check Point (1;2)

NEC UNIVERGE SV8500
975 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 617 –
CHAPTER 5 Operation Procedure for System with PIR
4.4.1 Check Point (1/2)
Confirm the data shown below when service features cannot be assigned or service cannot be operated:
(1) Confirm that line capacity of physical PIR and virtual PIR is set correctly.
(2) Confirm that value of ASYD command to display LP mounting status is assigned as below.
ASYD, SYS1, INDEX198=33
ASYD, SYS1, INDEX199=33
(3) Compare the status of “virtual PIR mounting information” with “physical/virtual PIR line capacity” dis-
played. Data is assigned as below in this system.
ASYD, SYS1, INDEX556=F0
ASYD, SYS1, INDEX557=FF
(4) Confirm that all units are properly mounted by using the AUNT command.

Table of Contents

Other manuals for NEC UNIVERGE SV8500

Related product manuals