EasyManua.ls Logo

NEC UNIVERGE SV8500 - TSWR Power ON;OFF Procedure

NEC UNIVERGE SV8500
975 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 674 –
CHAPTER 5 Operation Procedure for System with PIR
5.6.4 TSWR Power ON/OFF Procedure
Turn ON:
STEP 1: Supply the power to BASEU. When the power cable between BASEU and
TSWR is connected, BASEU starts supplying the power to TSWR here.
STEP 2: Flip -48V SW switch up on the DC-DC power (PWR/DPWR) card.
Turn OFF:
STEP 1: Flip the -48V SW switch down on the DC-DC power (PWR/DPWR) card.
STEP 2: Stop supplying the power to BASEU.
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required

Table of Contents

Other manuals for NEC UNIVERGE SV8500

Related product manuals