EasyManua.ls Logo

NEC UNIVERGE SV8500 - Page 657

NEC UNIVERGE SV8500
975 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 610 –
CHAPTER 5 Operation Procedure for System with PIR
Note: When performing loop-back connection tests on the trunks at the users office, provide cross connection
as follows:
(1) For a COT
Set up a loop-back connection between the C.O. Trunk (COT) to be tested and station line.
The trunk route must be assigned for Loop Start.
(2) For a MC-MG (COT)
Set up a loop-back connection between the C.O. Trunk (COT) to be tested and station line.
The trunk route must be assigned for Loop Start.
(3) For a TLT (for DID)
Set up a loop-back connection between the TIE Line Trunk (TLT) to be tested and another TLT.
If the TLT is a Direct Inward Dialing (DID) Trunk, connect the related leads as shown below:
LC
A
LC
B
LC
C
COT
LC
A
LC
B
MC-MG (COT)
IP Station
LC
A
TLT
LC
B
TLT

Table of Contents

Other manuals for NEC UNIVERGE SV8500

Related product manuals