1
WEILER E2850 REMIXING TRANSFER VEHICLE
5-14
Maintenance
5
Maintenance Procedures
Braking System - Test
1. Remove wire harness (1) from park brake solenoid.
NOTICE: Ensure needle valve (2) on park brake
solenoid is fully open (counterclockwise).
2. Start engine and place throttle at full speed.
3. Place Propel 3-Speed Control in Work Low.
4. With park brake applied, move Propel Lever forward
to attempt to drive machine forward. The machine
must not move.
5. Follow
"Machine Shutdown Procedure", page 3-11.
6. Reconnect wire harness to park brake solenoid.
Machine movement can occur during brake test if brakes do not function
properly. Death or serious injury possible if bystander is struck, crushed,
or runover.
Clear area of all personnel and obstructions before testing brake holding
capacity.