EasyManua.ls Logo

Weiler E2850 - Preparing Machine; Operator Stations Setup

Weiler E2850
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WEILER E2850 REMIXING TRANSFER VEHICLE
3-13
Operating Instructions
3
Preparing Machine
PREPARING MACHINE
Operator Stations Setup
1. Unlock and open hinged dump hopper/windrow
control station vandal cover (1).
2. Unlock and lower conveyor service control station
vandal cover (2).
3. Store and secure main operator station vandal
cover (3) on platform railing.
WARNING
Unsecured vandalism cover may fall off moving machine resulting in death
or serious injury to pedestrians or motorists.
Secure all covers in place prior to moving machine.

Table of Contents

Related product manuals