WEILER E2850 REMIXING TRANSFER VEHICLE
3-7
Operating Instructions
3
Machine Starting Procedure
5. Turn Park Brake (2) on.
6. Turn Ignition Switch (3) to start engine until
engine begins to idle, then release switch.
NOTICE: Do not crank engine for more than 30
seconds. Allow starter to cool for two minutes before
cranking again.
NOTICE: Engage various hydraulic systems at lower
engine speeds until hydraulic fluid is warm to avoid
system damage.