Maintenance-Object Repair Procedures
555-233-143
8-1276 Issue 1 May 2002
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external PMS
device. If the link has been disconnected already, then this test just returns
“PASS.” Every resource allocated for a PMS Link is released after this test.
Table 8-516. Test #213 Link Tear Down Test
Error
Code
Tes t
Result Description / Recommendation
40
50
ABORT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010 ABORT The PMS Link has been busied out and placed in the out-of-service state.
1. Enter release pms-link command to release the PMS Link from busyout
state.
2. Retry test pms long command to execute the test.
2012 ABORT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS The PMS Link is torn down.