PRI-CDR/SEC-CDR (Call Detail Recording Link)
Issue 1 May 2002
8-1329555-233-143
e. Software detects an overflow of CDR records generated in the switch due
to the heavy trunk traffic and low speed CDR output device. If both primary
and secondary links are ON, the secondary link is torn down temporarily for
two minutes to speed up the output process to the primary link. No action
is necessary for this error type.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. For example, by clearing error codes associated with the
Link Tear Down test (#213), you may also clear errors generated from other tests
in the testing sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. Every resource allocated for a CDR link is released after this test.
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
1. D = Destructive; ND = Nondestructive
Link Tear Down test (#213) X D
Link Retry test (#215) X X ND
Table 8-535. Test #213 Link Tear Down Test
Error
Code
Tes t
Result Description / Recommendation
40 ABORT Internal system error.
50 ABORT Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010 ABORT The CDR link has been busied out to out-of-service.
1. Enter the release cdr primary | secondary command to release the CDR
link from busyout state.
2. Retry the test cdr primary | secondary long command to execute the
test.
Continued on next page