EasyManua.ls Logo

Avaya S8700 - Page 2578

Avaya S8700
2618 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance-Object Repair Procedures
555-233-143
8-1856 Issue 1 May 2002
VC Port Reset DSP Test (#1106)
This test is destructive.
This test resets the VC-DSPPT and the DSP associated with it. As part of the
reset procedure, the VC-DSPPT will execute a series of self-tests on the
hardware. If these self-tests fail, the test will fail; otherwise the test will pass.
Before executing the test, the VC-DSPPT must be busied out by executing the
busy port UUCSSpp command. After the completion of the test, the VC-DSPPT
must be released by executing the release port UUCSSpp command.
Table 8-711. Test #1106 VC Port Reset DSP Test
Error
Code
Tes t
Result Description / Recommendation
1000 ABORT System resources required to run this test are not available, or the port may be
busy with a call.
1. Retry the command at 1-minute intervals up to 5 times.
1015 ABORT The VC-DSPPT is not busied out.
1. Busyout the VC-DSPPT by executing the busy port UUCSSpp command,
and then retry the test.
2000 ABORT Response to the test was not received from the VC-DSPPT within the
allowable time period.
1. Retry the command at 1-minute intervals up to 5 times.
2. If this result occurs again, replace the circuit pack.
2012 ABORT Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
2100 ABORT Could not allocate the necessary resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL The reset of the VC-DSPPT was unsuccessful.
1. Replace circuit pack.
PASS The VC-DSPPT was successfully reset.
1. Release the VC-DSPPT by executing the reset port UUCSSpp command.
Continued on next page

Table of Contents

Other manuals for Avaya S8700

Related product manuals