INSTALLATION AND STARTUP
1MANUL220 Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 8-5
Chapter 8 MixStir® Options Triple Foam and High-Pressure Wax
High Pressure Wax Option #2
MixStir® Tank Assembly and Installation
6. Confirm that there is a Solenoid valve connected to the High-Pressure Tee at the bottom of the
Pumping Station as shown below. If not, secure a valve and barbed fitting into place. See the images
below.
7. Run a 1/2” water line from the barbed fitting of the Solenoid valve to the barbed fitting on the High-
Pressure Check Valve Assembly. See the images below.
8. Position your field supplied chemical drum near the MixStir® tank. See the image below.
Note: For best performance, position the drum as close as possible to the tank.
Note: That orientation will reduce chemical travel distance.