INSTALLATION AND STARTUP
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL220
Rev
Release
Date
Description
Under Base FreeStyler® removed Carriage and Boom Assembly, Pump Station
Optional and Pneumatic Manifold Optional along with the specifications of the
poly-flow tubing and hydraulic hose assembly information for each of these.
Machine Control Center (MCC) Panel Layout and E-1063 Operator Interface moved
to Chapter 5 Electrical. Added Fastening Needs and Other Required Materials
Under Fastening Needs and Other Required Materials removed Rocker Spin Clean
Optional and Rocker (side) Blasters Optional.
Added FreeStyler® Utility Recommendations Floor Mounted
Removed “and Rocker Spin Clean” after the word Undercarriage in the second
bullet point
Chapter 4 Added reference to Chapter 17 for Onborad Drying Applications. Frame
Overview was Floor Mounted Frame and bay was tunnel in second intro paragraph
Changed the word Rectangular to Square (2 places)
Chapter 3 was previous section in Step 1
In Floor Mounted Frame step 14, step 18 and the image on page 4-5 changed the
dimension from the floor to the underside of the headbeam from 131” to 133”.
Carriage Prep updated per current practices, updated Drive Shaft Disengagement
Step 1 was 10. Updated Stop Clamp images per current design.
Step 1 was changed from “which position of the travel stops” to “where to position
the Travel Stops”.
Step 2 was 11. Step 3 was 12. Updated Stop Clamp images per current design.
In Step 1, center position was between the Rail Travel Stop and the Head Beam. In
Step 4, center position was between the end of the rail and the Head Beam and
added Stop Clamp to image.
Added note to image in Step 5.
Configuring the Sonar Unit updated per current practices.
Added Notes above instruction.
Changed dimension in Installing the Boom Mount step 3 from 110-7/8” to 112-7/8”
and added the Notes below the image.
Changed title from Standard “Channel” Boom Installation to Installing the Boom
Mount
Added “frame” to the note From entrance side of exit 4 x 6 frame leg
Added “frame” to the note From entrance side of center 4x6 frame leg
Changed dimension 23-1/16” to 22-1/8”
Copied 6-Legged Boom Mount information to Chapter 17.
Changed the order of the steps for Installing the Boom Mount and added more detail
instructions to steps 2-5.
Added Installing the Optional Freestanding Boom Mount Leg section.
Added or Freestanding Mount Leg to both of the Notes in step 2
Added or Freestanding Mount Leg to the bullet item in step 3
Added or Freestanding Mount Leg to both images before step 3
Added or freestanding to step 3
Step 5 was 6. Step 6 was 5.
Added or freestanding to Step 5
In section Setting Up Slack Vertically (step a) changed wall mount bracket to mount
bracket (two places). Added Note: The mount bracket is either attached to the wall
or the freestanding mount leg.
Added or Raceway to Boom Channel note in image
Removed Wall in Mount Bracket note in image
Removed Wall in Mount Bracket note in image
In the Notes: above Step 10 removed “wall” before mount bracket and “all” before be
Added or Freestanding Mount to the notes in the images
Added or Freestanding to the Notes in the box below the images
Quantity of Boom Clamp hardware is 4 each, was 2 each. Quantity of 2 added to
PVC Snap Clamp
Added Freestanding Mount images
Updated Drive Shaft Re-engagement process