EasyManua.ls Logo

Develop ineo 350 - Page 285

Develop ineo 350
770 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19. Malfunction code Field Service Ver. 1.0 Aug. 2005
246
bizhub 200/250/350
Troubleshooting
19.3.22 C4101: Polygon Motor Failure
19.3.23 C4721: Main Unit G/A Communication Failure
19.3.24 C5102: Main Motor Failure
Relevant Electrical Parts
PH Unit (PH) MFBS Board (MFBS)
Step Action
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Check the PH connector for proper connection, and
correct as necessary.
--
2 Change PH - -
3 Change PWB-A - -
Relevant Electrical Parts
Mechanical Control Board (PWB-A)
Step Action
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Turn OFF the Main Power Switch, wait for 10 sec. or
more, and turn ON the Main Power Switch.
--
2
Check each control board and the PWB-A for proper
connection, and correct as necessary.
--
3 Change PWB-A - -
Relevant Electrical Parts
Main Motor (M1) Mechanical Control Board (PWB-A)
Power Supply Unit (PU1)
Step Action
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Check the M1 connector for proper connection, and
correct as necessary.
--
2
Check the M1 for proper drive coupling, and correct
as necessary.
--
3
Check the PWB-A connector for proper connection
and correct as necessary.
--
4 M1 operation check PWB-A PJ28A-4 (REM) M-4
5 Change PWB-A - -
6 Change PU1 - -

Table of Contents

Related product manuals