EasyManua.ls Logo

Husqvarna TE511 - Idler Gear Disassembly; Idler Gear Assembly

Husqvarna TE511
385 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
F1.97
H01805
ENGINE DISASSEMBLY/REASSEMBLY
1
st
edition (08-2010) _Rev. 11-2010
Idler gear disassembly
Caution
Temperature differences as well as casing overheating may lead to structure
changes and to cracks due to internal stresses.
Evenly heat casing, making sure not to exceed the recommended value.
Heat gear (1), and remove it using a suitable tool.
Technical specications
Release/connection
temperature
80 °C
Idler gear assembly
Caution
Temperature differences as well as casing overheating may lead to structure
changes and to cracks due to internal stresses.
Evenly heat casing, making sure not to exceed the recommended value.
Heat idler gear (1) and assemble it.
Technical specications
Release/connection
temperature
80 °C

Table of Contents

Related product manuals