EasyManua.ls Logo

ICON A5 - Page 558

ICON A5
836 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14-50 LANDING GEAR / MAIN LANDING GEAR
ICON A5 / MAINTENANCE MANUAL CHANGE C2
CHAPTER 14
7. Install safety wire in the groove in the wheel assembly to retain the brake rotor.
8. Lower the aircraft off of the jacks once the verification steps are complete.
VERIFICATION METHOD:
Spin wheel to verify that it is not contacting the brake assembly or any other components.
Actuate brakes to verify system function.
RELATED INFORMATION:
"Main Landing Gear (MLG) Boot Installation" on page 14-42
"Empty Weight and CG Measurement While on Jackpoint Scales" on page 3-32
14.6.1.8 Main Landing Gear (MLG) Actuator Removal
Use the following task to remove the main landing gear (MLG) actuator.
TASK INFORMATION:
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
11—Landing Gear
Consumables
None
TASK INSTRUCTIONS:
1. Jack the aircraft until the landing gear is safely off the ground.
2. Remove the aft bulkhead baggage panel. (See “Removal and Installation of Inspection Panels and
Fairings” on page 3-34.)
3. Disconnect the MLG actuator connector at the aircraft harness.

Table of Contents

Other manuals for ICON A5