14-66 LANDING GEAR / NOSE LANDING GEAR
ICON A5 / MAINTENANCE MANUAL CHANGE C2
12. Cycle the nose landing gear. Ensure that gear doors do not interfere with any other components
when the nose landing gear is fully extended and retracted. Adjust as necessary.
13. Lower the aircraft from jacks or remove weight and foam blocks as appropriate.
VERIFICATION METHOD:
The procedure is complete when the nose landing gear leg assembly has been installed and the landing
gear cycle checks have been completed successfully.
RELATED INFORMATION:
"Nose Landing Gear (NLG) Cam Follower Replacement" on page 14-66
"Right Instrument Panel Top Panel Installation" on page 8-18
"Left Instrument Panel Top Panel Installation" on page 8-21
"Battery Removal and Installation" on page 6-37
14.7.2.5 Nose Landing Gear (NLG) Cam Follower Replacement
Use this procedure to replace the nose landing gear (NLG) cam follower.
TASK INFORMATION:
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
11—Landing Gear
Consumables
LOCTITE
®
603™
Tef-Gel
®
1. Remove forward landing gear door assembly. (See “Removal and Installation of Inspection
Panels and Fairings” on page 3-34.)