PROPULSION / ENGINE 16-57
CHANGE C2 ICON A5 / MAINTENANCE MANUAL
Use illustrations as a reference for the oil cooler installation with some of its main components.
3. Replace engine cowling.
VERIFICATION METHOD:
Acceptable condition of hoses/tubes and leak-free installation provide verification of completion.
RELATED INFORMATION:
"Condition and 100-Hour Inspection—Operational Inspection" on page 3-25
"Remove Engine Cowlings" on page 16-13
"Install Engine Cowlings" on page 16-16
16.1.7.2 Maintenance Instructions
16.1.7.2.1 Engine Coolant Replacement
This procedure covers draining coolant from the engine and radiator, overflow bottle, and ECS system.
Perform all three or only the ones that are required for the specific maintenance situation.
TASK INFORMATION:
Type of Maintenance
Line