EasyManua.ls Logo

LPKF ProtoMat S62 - Production Phases

LPKF ProtoMat S62
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Automatic operation
42 ProtoMat
®
S62
Automatic production takes place phase-by-phase, whereby each pro-
duction phase must be started manually. The production phases should
always be carried out one after the other in the order specified. Individual
production phases can be skipped and/or executed at a later time. Note,
however, that some work steps are based on previous production phases
which cannot be executed afterwards.
You can create additional phase files for your individual applications
and/or reconfigure existing ones. Please see the BoardMaster manual for
information.
3.7.2 Production phases
The following production phases are contained in the phase files:
Tab. 3: Production phases
1/2-layer printed circuit boards
Plating LPKF ProConduct Galvanic
Required phase file 1-2layer + proconduct.phs 1-2layer.phs (<default>)
Production phases
(Page 1 of 3)

Table of Contents

Related product manuals