EasyManua.ls Logo

Navistar INTERNATIONAL DT 466 - High-Pressure Hose Assembly - Generation 1; High-Pressure Hose Assembly with 70 and 90 Degree Elbows - Generation 2

Navistar INTERNATIONAL DT 466
520 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FUEL SYSTEM 345
High-pressure Hose Assembly Generation 1
Figure 536 Removal of high-pressure oil hos
e
assembly
1. Remove the high-pressure oil hose assemb
ly
between the high-pressure pump assembl
yand
cylinder head.
2. Remove and discard O-ring at each tt
ing.
3. If necessary, remove high-pressure
hose tting
located at cylinder head.
High-pressure Hose Assembly wi
th 70 and 90
Degree Elb ow s Gener atio n 2
1. Remove the conduit cover from th
e high-pressure
hose assembly.
Figure 537 High-pressure hose assembly
connections (typical)
1. High-pressure oil hose
2. High-pressure oil hose nut (2)
3. Elbow jam nut (2)
4. 70 degree elbow
5. Swivel nut (2)
6. 90 degree elbow
2. Remove high-pressure oil hose swivel nuts from
70 and 90 degree elbows. Use one wrench to
hold the high-pressure oil hose nut in place while
loosening its corresponding swivel nut using
another wrench. Remove the high-pressure
hose.
Figure 538 High-pressur
e oil elbow (typical)
1. O-ring seal (#14) (2)
2. Back-up ring
3. Elbow jam nut
4. Elbow
EGES-265-2
Read all safety instructions in the "Safety Information" section of this manual before doing any procedures.
Follow all warnings, cautions, and notes.
© 2009 Navistar, Inc.

Table of Contents

Other manuals for Navistar INTERNATIONAL DT 466

Related product manuals