DIAMOND LOGIC® ENGINE BRAKE 403
H08090
1
3
4
7
8
11
12
2
5
6
9
10
Figure 6 47 Torque sequence for high-pressure oil rail bolts
2. Install and hand tighten all high-pressure oil rail
bolts (M8 x 90). Torque bolts to the special torque
value (Table 55) in a circular pattern, beginning
from the center.
NOTE: Air trapped in the engine brake rail will be
purged automatically during the cranking and start up
phase.
Electrical Connections
Figure 648 Injector electrical connector
1. Connect each valve cover gasket pass-through
connector to its respective injector and clip
harness on the high-pressure oil rail.
Figure 649 ICP sensor electrical connector
2. Connect ICP sensor electrical connector to valve
cover gasket pass-through connector (rear) and
clip harness to high-pressure oil rail.
EGES-265-2
Read all safety instructions in the "Safety Information" section of this manual before doing any procedures.
Follow all warnings, cautions, and notes.
© 2009 Navistar, Inc.