WEILER E2850 REMIXING TRANSFER VEHICLE
3-15
Operating Instructions
3
Preparing Machine
9. Rotate control station by pulling Control Station
Pivot Lock Lever (10) up. Release lever to lock
control station in desired position.
10. Place mirrors (11) in working position.
Adjust mirrors for visibility to far side of machine
and to the operator on the ground at dump hopper
controls.
11. Place engine compartment railings (12) in working
position.